Specification:

Provide vertical posts of 1-5/8 x 3-1/4 Nu-Strut N200A at a maximum of 48" on center.  Anchor to ceiling with N1123 angle clip and support diagonally with 2 each N1490-24 tubular diagonal supports at each side of  vertical posts, and one N1490-18 supports at each end of the assembly.   Bottom channel shall be formed of 14 GA. CRS, and attached to vertical posts with 1/4" bolts and spring nuts.  Provide ceiling escutcheon plates when located at drop ceilings.  Assembly shall be provided with high impact powder coat finish selected from standard colors.  Anchors to secure to building structure are not included.